Overview
This use case analyses the power infrastructure (PV panels, batteries, charging infrastructure), the control and communication infrastructure, and the various communication protocols. This knowledge will then be used to optimise the location and operation of battery systems.
Expected Outcomes
- To enable the POST to choose a charging strategy to reduce the energy consumption.
- KPI: 15-20% Reduction (for fleet operator) of peak load.
- KPI: 10-15% Reduction (for fleet operator) of charging costs.
- Improve accuracy of the energy consumption prediction for the Post Depot (Mean Absolute Error < 20%).
- To enable the POST to select charging strategies that reduce fleet energy consumption and total operating cost.
- KPI: 5% reduction of carbon dioxide (CO2) emissions.
This use case is now available in the hourglass canvas, mapping the relevant stakeholders against the capabilities required for delivery and uptake. Explore it to identify who needs to be engaged, what is already in place, and where capability gaps remain
View this use case on the hourglass model